Generic selectors
Exact matches only
Search in title
Search in content
Post Type Selectors
Polehampton Junior School

Polehampton Junior School

Polehampton Junior School

Polehampton Junior School

Project Info:

Location: Wokingham, Berkshire

Age Range: 7 - 11 Years Old

Budget: £27,000

Sector: Primary

Project Info:

Location: Wokingham, Berkshire

Age Range: 7 - 11 Years Old

Budget: £27,000

Sector: Primary

Playground climbing frame with ropes and swings on a soft surface, surrounded by green trees and a grassy field under a blue sky. Children’s playground climbing structure with ropes, wooden beams, and a blue climbing wall on a rubber surface, situated in a park with grass and trees under a partly cloudy sky.
Key Outcomes
  • The play area has been modernised with new, high-quality equipment, creating a safer and more engaging environment for the children of Polehampton Junior School.
  • The redevelopment has opened up the space and introduced new physical challenges, helping children develop their balance, coordination, strength, and confidence.
  • Key Stage 2 pupils now have an exciting, year-round play space that encourages active play, physical development, and social interaction.

Customer Feedback

Working with Playtime was an excellent experience from beginning to end. Actions speak louder than words, and the experience was so good, I have now ordered a similar piece of works via Playtime at our Infant School to be completed in Summer 2026

S. Rance, Operations Manager

PROJECT BRIEF

The school had recognised that the existing play equipment was over 15 years old and had reached the end of its effective lifespan. Therefore, making replacement necessary to ensure continued safe use and engagement for the children.

The project was made possible through the support of the school’s PTA, who funded the new equipment through dedicated fundraising efforts carried out over several years.

 

THE DESIGN PROCESS

Fawns’ local outdoor play consultant met with Operations Manager Mr Rance to discuss the removal of the existing equipment and the installation of a new, modern play area. The school welcomed ideas and collaborated closely throughout the early planning stage.

Using the school’s input as a guide, Fawns presented a design and quotation to the Operations Manager.  After a few minor refinements, the final proposal was agreed, and the project was approved to proceed.

Mr Rance confirmed that Playtime by Fawns provided the most competitive quotation, alongside the most comprehensive pre-installation service, with strong support from both the sales team and project management team throughout the process.

 

OTHER PROJECTS

St Oswald’s CofE Primary Academy 

Poplar Street Primary School 

Bucklebury CE Primary School 

Playground climbing frame with ropes and swings on a soft surface, surrounded by green trees and a grassy field under a blue sky. Children’s playground climbing structure with ropes, wooden beams, and a blue climbing wall on a rubber surface, situated in a park with grass and trees under a partly cloudy sky.

Similar Projects

Looking for some playground ideas and inspiration? We have plenty of recent playground projects for you. You can filter based on budget, location and project type.

© Playtime By Fawns | 2026 website developed & maintained by digidoda

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.