Toggle Menu Toggle Search
Back to all Projects

Sundridge & Brasted CofE Primary School

Sundridge & Brasted CofE Primary School Sundridge, Kent
Suitability:
KS1
KS2
Project Descriptions

Location: Sundridge & Brasted CofE Primary School Sundridge, Kent

Project Value: £13,000+

Age Range: 5-11 (Key Stage 1 & Key Stage 2)

Delivering Inspirational School Playground Equipment

Sundridge & Brasted CofE Primary School were looking to transform their existing playground. They wanted to replace their old, unsafe, play equipment. The challenge they faced was the area of the playground they wanted to develop was compact and on a slope. Upon meeting with the school and inspecting the play area, our expert Playground Consultant Neil Martin, knew that he needed to design a bespoke piece of play equipment to fit into the limited space that would be provide age-appropriate physical challenge for the children and accommodate the contour of the ground.  By using his 17 years of experience and vast knowledge of outdoor play and learning within education, Neil designed bespoke equipment using a variety of trim trail components. Doing this ensured the new area would be fun and engaging for the children whilst also meeting the schools request to develop agility, balance and co-ordination during break times.

Best Playground Equipment

Sundridge & Brasted CofE Primary School and Playtime by Fawns have been working together over the last few years to provide the pupils of the school with opportunities for outdoor play and learning. So, when they approached most recently to develop a small, underutilised area of their school playground, and install something new and exciting that would be suitable for all the pupils we were keen to create the perfect solution.

What Went into the Primary School Playground

The playground included the following, to ensure we achieved the brief of a challenging and inclusive playground:

  • Log traverse
  • Link parallel rope walk
  • Adjoining crossed rope
  • Bespoke 3m balance beam
  • Adjoining parallel rope walk
  • Link H rope walk
  • Drop rope traverse
Growth, Learning and Development within the Playground

Sundridge & Brasted CofE Primary School has an ethos that ensures that every child can fully experience school both inside and outside the classroom by providing an inspirational and creative curriculum, rich in opportunity and full of challenge. Naturally, the gradual changes to the outside playground areas fully support this ethos and we feel very privileged to be able to contribute to the pupil’s ongoing growth, learning and development, for many years to come.

Key Results:
  • A bespoke piece of play equipment design specifically to fit into the limited space.
  • Age-appropriate physical development for Key Stage 1 and Key Stage 2 children
  • Safe and fully compliant with BSEN1176 & BSEN1177
  • Removal of unsafe, old equipment
What Do Sundridge & Brasted CofE Primary School Have to say about the project?

“The whole team were phenomenal this year, working so hard to stick to the schedule and create our wonderful play area, in sub-zero temperatures and working with our particularly tricky site!”

Are you thinking about new playground and outdoor learning options? We can help!

You can find out more about our work with schools and nurseries and view our full range of outdoor play equipment here.

Contact us to arrange a free, no-obligation consultation. Alternatively, you can view all our outstanding playground projects completed, by clicking here.

Interested In A Project Like This?
01252 515199 Contact Our Team