Location: Westcliff-on-Sea, Essex
Project Value: £94,000
Age Range: 4-11
KEY OUTCOMES
- All 7 areas of learning achieved within new play space. Additional physical development items to develop gross motor skills.
- New Duralawn Surfacing installed across muddy area, ensuring the children can use the whole play space in all weathers.
- Main Playground – Large groups of children all able to use the equipment at the same time due to its size and open-ended design.
- New playground equipment has massively changed the play dynamic during break and lunch times. With improved physical fitness across the school as well as increased communication and language skills.
FEEDBACK FROM THE CUSTOMER
“Our play equipment was old and weathered so the children were unable to use the areas. Fawns came in and designed the new areas from our brief and the installation team worked hard during some awful weather to deliver the project on time and to a very high standard.
We would definitely use Fawns for any other project in the future.”
Mr Anderson, Premises Manager
BACKGROUND
Prince Avenue Academy and Nursery is in the seaside suburb of Westcliff-on-Sea in the county of Essex.
The school’s main vision is to work together in a caring environment, developing their core values of pride, respect, inclusion, nurture, courage, and excellence, celebrating success with a smile!
PROJECT BRIEF
The reception play area had old equipment with a large area of grass that had become so muddy it could no longer be used during the winter. The school wanted to create a space where the children could work on their physical development. Focusing on the 7 areas of learning.
Additionally, the main school playground was lacking any equipment for the Key Stage 1 and Key Stage 2 children to utilise during breaktimes. The school were keen to introduce a new piece of play equipment that would cater for a large group of children at a time, offering age-appropriate challenge for all abilities.
THE DESIGN PROCESS
The local play consultant met with the Prince Avenue Primary School Premises Manager initially to discuss the project in a bit more detail.
It was known that the school wanted to update their EYFS play area and were seeking a large climbing structure in the main playground but were open to ideas on what would work best for the age ranges and mixed abilities of the children.
A design proposal was created and presented to the school, and with some minor adjustments, a final design was agreed. Fawns were chosen as the preferred supplier as they provided the exact equipment that met the brief and the learning outcomes, the school required for their pupils.
COMPLETED PLAYGROUND PROJECT
Reception Area – EYFS Seven Area’s of Learning
Sandpit with Sliding Lids | Water Play | Music Panel – Tube Glockenspiel |
Messy Kitchen | Log Traverse | Music Panel – Bongos |
Play Barn * | Inclined Balance Weaver | Music Panel – Shaker |
Double Water Table | Horizontal Monkey Bars | Duralawn Surfacing |
Wooden Skip and Blocks | Bespoke Decking Stage with Back | Playground Markings |
*This item has been updated and is now the Role Play House, item linked to website.
Main Playground – Physical Development Area
Pick Up Sticks 8 | Duralawn Surfacing |
Pull Up Bars |