Toggle Menu Toggle Search
Back to all Projects

Holy Trinity CE Primary School

Wakefield
Suitability:
KS2
Project Descriptions

The school wanted to enhance their Key Stage 2 playground with a piece of equipment that would challenge the children physically and accommodate as many children as their budget would allow. The Pick Up Sticks 8 was the obvious choice. This imposing and varied climbing frame offered excellent value for money and ensured children of all abilities would be catered for allowing them to burn off excess energy and be ready to learn after their break. The location and choice of our Durabond bonded rubber mulch safety surfacing has allowed the school to extend their available playing space in all weathers.
The school loved their Pick Up Sticks 8 so much that we have recently just installed its little brother the Pick Up Sticks 4 onto their Key Stage 1 playground. This unit provides a fantastic challenge for this age group and prepares them to tackle the larger frame as they move through their school years.

Interested In A Project Like This?
01252 515199 Contact Our Team
Products Featured In This Project: