Toggle Menu Toggle Search
Back to all Projects

Colebourne School

Project Descriptions

Meeting Fawns at the 2010 Education Show in Birmingham, facilities manager Sam Hughes maintained contact until she was ready to begin planning. Fawns were given a brief for age appropriate climbing equipment in the early years, key stage 1 and 2 playgrounds along with roadways for the early years and key stage 1 play areas. Ensuring the equipment required minimum maintenance on an annual basis.

Colebourne School were keen to see a progression in the challenge of the chosen play equipment offered for each age group. They were happy to promote managed risk with a supervised environment.

Fawns installed a roadway with arch bridge and marco polo 900mm within the early years area. Roadway with play scene panels, a double deck Hollywood tower 900mm plus low level trim trail in the key stage 1 play area and a Hillary unit and climbing wall in the key stage 2 play area. Each installation was into tarmac with coloured wetpour surfacing.

Overall Fawns built a great relationship with the school. Facilities Manager Sam was happy with every element of Fawns products and services and would be very happy to recommend Fawns to other schools.

Interested In A Project Like This?
01252 515199 Contact Our Team